Start with the crop, then the flow
A curing tunnel has to keep pace with the real bottleneck, which is how much green leaf comes off the land each day at peak reaping. Size around the peak rather than the average, or the tunnel backs up exactly when the season is busiest.
So we start with your hectares and expected yield, work back to a daily curing throughput in kilograms, and match a tunnel in the ROC Super Eco Tunnel range to it.
- Hectares under tobacco and expected yield per hectare
- Peak reaping rate, meaning how much green leaf comes in on the busiest days
- How you load: trolleys, clips, and the labour you have
- Fuel and power on hand, which set the heat and airflow package



